New A/C unit for M-block

With the rebuilding of the school, all new classrooms and most of the older classrooms are now airconditioned.

Level 1 of M-Block is the last main classroom area that was not. The M-Block building is a brick and concrete structure that is cold in winter and hot in summer.

There are 4 classrooms on Level 1 that are 90% booked during term time and are used by students across the faculties of CAPA, Social Science, History and Geography.

The P&C has funded installation of a new A/C system for M-block ensuring students and staff are comfortable both in the upcoming summer months and following winter months.

The P&C is also looking into funding installation of A/C in the school hall and the MPC, ensuring the full school has access to cooling and heating.

If you want to learn more, please join one of our general meetings, or become a member if you wish to have a say.

Similar Posts